Galactic Civilizations Wiki
Advertisement

This table applies to Suicidal difficulty. However, the only difference on lower difficulties is a reduction in lease length for United Builders, Inc. and Mitrosoft.

G = Galactic Manufacturing Corp. ()

T = Terran Manufacturing ( plus per week for weeks)

U = United Builders, Inc. ( plus (this number is sometimes 1 too small) per week for weeks)

M = Mitrosoft ( plus per week for weeks)

Production cost Contractor Cheapest in given timeframe (cost)
  G T U M 24 wks 48 wks 96 wks 192 wks
5 30 20+2/2 wks 60+9/24 wks 55+3/147 wks T (24) T T T
8 54 36+2/3 wks 64+10/25 wks 57+3/149 wks T (42) T T T
11 78 48+3/4 wks 76+13/26 wks 63+5/154 wks T (60) T T T
13 96 64+4/5 wks 82+14/27 wks 66+5/156 wks T (84) T T T
14 108 72+4/5 wks 86+15/27 wks 68+5/157 wks T (92) T T T
15 114 76+4/6 wks 88+15/28 wks 69+6/158 wks T (100) T T T
18 144 96+5/6 wks 98+17/29 wks 74+6/161 wks T (126) T T T
22 174 116+6/7 wks 108+18/29 wks 79+7/164 wks T (158) T T T
25 204 136+7/8 wks 112+18/30 wks 84+7/167 wks T (192) T T T
28 234 156+8/9 wks 128+20/31 wks 89+8/170 wks T (228) T T T
29 240 160+9/9 wks 130+21/31 wks 90+8/171 wks G G G G
31 258 172+9/9 wks 136+21/31 wks 93+8/172 wks T (253) T T T
33 276 184+10/10 wks 140+22/32 wks 95+9/174 wks G G G G
35 294 196+10/10 wks 148+23/32 wks 99+9/176 wks G G G G
38 324 216+11/11 wks 158+24/33 wks 104+9/178 wks M (320) G G G
40 342 228+12/11 wks 164+24/33 wks 107+10/180 wks G G G G
43 372 248+13/12 wks 174+25/34 wks 112+10/183 wks M (352) G G G
45 390 260+14/12 wks 180+26/34 wks 115+10/184 wks M (355) G G G
48 420 280+15/13 wks 190+27/35 wks 120+11/187 wks M (384) G G G
50 438 292+15/13 wks 196+27/35 wks 123+11/188 wks M (387) G G G
53 468 312+16/14 wks 206+28/35 wks 128+11/191 wks M (392) G G G
56 498 332+17/14 wks 216+29/36 wks 133+12/193 wks M (421) G G G
59 528 352+18/15 wks 226+30/36 wks 138+12/196 wks M (426) G G G
62 558 372+19/15 wks 236+31/37 wks 143+13/198 wks M (455) G G G
65 588 392+20/16 wks 246+31/37 wks 148+13/201 wks M (460) G G G
68 618 412+21/16 wks 256+32/38 wks 153+13/203 wks M (465) G G G
71 648 432+22/17 wks 266+33/38 wks 158+14/205 wks M (494) G G G
74 678 452+23/17 wks 276+34/39 wks 163+14/208 wks M (499) G G G
350 3768 2512+126/50 wks 1306+77/70 wks 678+35/402 wks M (1518) M (2358) G G
1000 11970 7980+400/103 wks 4040+136/117 wks 2045+66/797 wks M (3629) M (5213) M (8381) G
Advertisement